Joining the collaboration (WG9 - Mechanics & Cooling) since spring 2013 at CERN, the SERM is engaged in the construction of 4 molds for the composite molding of "cooling panels" and "space frames" for internal and external layers (silicon tracking detector). These molds will allow the polymerization of composite plates: length 1540mm - width 34mm and a thickness of 0.23mm to 0.16mm !
The delivery of these 4 qualification molds has been performed between june and octobre 2013.
Further to these molding tests realised at CERN, the Design will be optimised and our workshop should realize the updated production molds.
Contact: D. Grondin
ALICE-ITS: 3 Inner layers + 4 outer layers |
Composition d'un stave de l'outer barrel |
Moule pour space frame de l'Inner barrel |
Space frame et cold plate |
Depuis 2013, le service de mécanique du LPSC a pu collaborer au sein de la collaboration ALICE à la réalisation de pièces mécaniques utilisées pour le moulage de pièces en composite (cooling panel et space frame). A l’heure actuelle, il reste de grosses incertitudes sur les perpectives liées aux activités techniques de mécanique sur l’ITS. Cette activité permet de développer l’acquisition de compétences dans les domaines des structures composites, des techniques de refroidissement et des outils d’assemblage et d’insertion des modules élémentaires et des différentes couches.
Ainsi, le SERM réalise les dessins de conception et la production de l'outil d'assemblage des staves du Middle Barrel. Ce banc d'assemblage a été livré en juillet 2017 à l'INFN Turin avant son envoi définitif à SLAC (USA) qui réalisera les assemblages structures compsites refroidies + modules électroniques de détection.
Contact: Coordinateur Technique: C. Le Tulle
Banc d'assemblage des Staves du Middle Layer |